Buyer: Pull Installation and Forced Vendor Production Costs into Contracting

Click "Buy" then "Create Contract" on the left-hand side menu.





For "Contract Type" select "Proposal Based". Select an RFP and Proposal using the dropdown.





NOTE: Breaking out the Production and Installation costs is only applicable on Proposal-based and Multiple Proposal-based contracts.



Please make sure to have a checkmark in the box that says "Breakout Installation and Production line items" and click "Next".





Once the contract has been created, you're able to see in the Inventory Information/Billing Addendum that the installation and production costs were made on their own line: